Need a better floor section poured in my garage for a 2 post lift to be installed.
So a 4'x4' section, 6-8" thick and 30Mpa rating. I'm sure there's a minimum charge.
Also how difficult is it to achieve 30Mpa with the weather becoming cold?
Anything else to worry about with this area being non heated? Frost heave?
Original floor is about 10+ years old.