Originally Posted by
dirtsniffer
We replaced 25 windows with Ecoline. Ordered July 22, installed December 22. Except for 1 custom curved top window that they messed up. Took another 6 months to get it remade properly.. it was extremely aggravating to wait as long for them to fix their mistake as it did to order and build the other 24 windows. Other than that, they have been responsive in dealing with issues, needed a couple door adjustments trim repairs, screen replacements, 2 window panel defects corrected. Oh, and they did an absolute shit job at installing the window trim.
Glass seems great, house is much quieter and more resistant to outside weather. Did triple pane with a sunshield coating on the south facing windows.