cidley69
08-01-2010, 08:04 AM
Hi there,
I need some bobcat work done digging a trench for a footing and excavating an area to install a paving stone walkway?
I estimate it would take 2-3 hours to do this work.
I would also need to buy the sand and crush gravel for beneath the pavers.
Thanks,
I need some bobcat work done digging a trench for a footing and excavating an area to install a paving stone walkway?
I estimate it would take 2-3 hours to do this work.
I would also need to buy the sand and crush gravel for beneath the pavers.
Thanks,