I have a 4 rough in that I cut flush with the floor and now Im trying to install the 4 toilet flange. I dry fit the flange by beating it into the drain but I am worried that once I add ABS cement it will cure before I get a chance to beat it in. Is it supposed to be this tight? Am I missing something?