an 1/8 mile is a long DIY if you've never done it.
grab a pick axe and start hacking lol.
If you are doing it properly, take all the origonal out (pick-axe) - should come out in decent chunks
Get some good 3/4 crush, rake to level and pack
Get that black sticky shit from hell and "drizzle" it on the packed gravel - more around the edges of the patch (prevents lifting)
Whoever delivers the asphalt - try to get them to do a driving dump, a pile is good if you have a canvas to cover it.
Get a good wide alum rake - makes life easy (ier) and try to get it leveled as fast as possible to avoid cooling (the cooler the surface, the more water on the packer-drum is needed/likes to stick + lift)
Have a pail of Diesel there to clean your tools with as well (before and after each use)
Also - i can help if need be
CNC Guru*
* This is not an advertisement or porn..... but pm me lol
Instagram: goreski_rdd