We're building and we are looking at doing stone around two fire place's and a wall in the basement. The builder is quoting us $3,300 which I think is quite a bit. I'm wondering if I should just get them to leave it and have someone come in and do it after we take possession. I'm looking for an estimate (labour and materials) to do a total of 60sq ft.
Thanks